Engineered to be evaluated.

The full technical picture for the people who sign off: five subsystems, cold-climate free cooling, security controls by design, and a deployment path designed to take 8–12 weeks instead of years. All figures are design targets, to be validated on our prototype.

Five subsystems

What's inside the base.

01

Structure

A standardized, zoned container shell — factory-prefabricated, craned into place, and built around standardized interfaces for repeatable deployment.

02

Liquid cooling

Cold-plate liquid cooling with a CDU and dry coolers, augmented by cold-climate free cooling. Design PUE target ≤ 1.13, to be measured on our prototype.

03

Power and distribution

Power-first siting, including self-generation where the grid can’t reach. Each C40 is designed for 800 kW of facility power.

04

Spine-Leaf network

A Spine-Leaf fabric for high east-west bandwidth, with isolated out-of-band management for safe remote operations.

05

Monitoring and the platform

The MASH platform unifies DCIM, BMS and EMS, multi-tenancy, alerting, billing, and 24/7 remote operations across every base.

Efficiency

Cold-climate free cooling and PUE.

Canada’s climate is an asset. Free cooling uses cold ambient air to shed heat for much of the year, and cold-plate liquid cooling carries heat away at the source. Together they target a design PUE of ≤ 1.13, which we will measure on our prototype.

Design PUE target≤ 1.13
Cold supplyWarm return

Sovereignty and security

Sovereignty you can verify.

Where each certification stands today, and the security controls built into the design.

Certification status

  • UL 2755 — in preparation
  • CSA (electrical and fire safety) — in preparation
  • ISO/IEC 27001 — in preparation
  • SOC 2 — in preparation
  • Federal security assessment — entering CCCS assessment in 2028

MASH holds no certification today. Dates are estimates.

Data model: customer data is managed by the customer. MASH operates the facility and monitoring layer, and our facility telemetry stays in Canada.

Security controls (by design)

  • Network tiering and zero-trust segmentation
  • Role-based access control (RBAC)
  • Audit logging across the stack
  • TLS in transit and encryption at rest
  • Backup and disaster recovery

Deployment

From years to 8–12 weeks (design target).

A repeatable path from site survey to assured operations.

  1. 01

    Survey

    Assess the site: power, ground, access, and connectivity.

  2. 02

    Mobilize

    Transport, crane, position, wire, and commission the prefabricated base.

  3. 03

    Integrate

    Bring up the network, the GPUs, and the MASH platform.

  4. 04

    Assure

    Validate cooling, power, and availability targets, then hand over to 24/7 remote operations.

Want to put it in front of your evaluators?

We’ll share the C40 design specifications and the control set behind them.